Wednesday, August 10, 2011

Finished Walls

They finished sheetrocking the walls today! And also the paint guys did some more scraping and then painted one full side of the house and part of another! Pretty exciting!



Apparently the floor and ceilings in the kitchen weren't the only things that were not square. The basement doorway was too! 

There is a gap about one inch wide at the top of the door frame between the new board and the old one just to the right of it. 










The painters

Our one completely finished side!

Partially primed house front




Tuesday, August 9, 2011

Sheetrocking

On the menu for the day was sheetrocking the addition, some more plumbing work, and more siding work...painting a bajillion more shakes and nailing them to the house and garage very meticulously so they line up perfectly with the old shakes. Also, we (mom and me) learned last week that they no longer make the super wide cedar shakes that we have in some places on our house (~14+" wide?) because most of the cedar shakes now come from Japan and China and they don't have cedar trees that big evidently. So, to make the new shakes look more like the old ones, they are working super hard to match up grains in a few of the shakes here and there and nailing them down so they look like one large piece!

The white thing to the right is the pipe that brings heat upstairs in the wall between the kitchen and the dining room before the plumber took it out today
He then put in a new pipe that re-routes the heat so we can cut part of this wall out. In the end, this wall will look like the doorway between our dining room and living room, but a few inches wider. 

This is where the new pipe does another 90 degree turn to meet back up with the  register upstairs

This crazy yellow gizmo holds sheetrock in place so they can screw it into the ceiling!

The entire ceiling is done everywhere but the kitchen, and all of the walls are either completely done  or half done





The garage

Left side of the back of the house


From left to right: new color, primer, old/partially scraped paint

Friday, August 5, 2011

Marshmallow Fluff

The big adventures of the day included shingles and spray-foam insulation. And, as indicated by the title of this post, he insulation looks somewhat like marshmallow fluff! And was a multi-step process that I will have my momma explain in a "guest post" tomorrow or this weekend sometime.

All the insulation installation stuff came in this giant truck!

The color to the left is the new color of out house, the middle, lightest color is the primer, and the color to the right is the old color, but partially scraped off. The vertical strip running down the middle of the picture is a vinyl strip thing that separates the addition from the old house, I'm guessing as a waterproofing method...? 

One mountain of painted shingles

Yay for shingling! 

The second mountain of painted shingles...

The marshmallow fluff room. 


Surprise! I guess the shower was not stuck in place after all.....since it is now at a wonky angle in it's spot and covered in plastic to keep insulation out of it. 

Thursday, August 4, 2011

Painted Shakes

Tuesday, they put in the shower! And along with that, they started replacing some new shakes in places where they had to pull a bunch out to replace windows. We decided against vinyl siding  (boring!) and stuck with cedar shakes, which match the style of our house better anyways... A gajillion shakes were delivered on the back of a flatbed semi and are now stacked in the back of the garage, making it smell like a sauna!  :)  And the paint guys came and started priming some of the new shakes.

Today was a paint fest! There was an assembly line of three guys working on priming shakes, one putting out new ones to be primed and turning them over to have the other side done, the second one using a super painter thing (paint spray gun thingy? I have no idea what it is called). And the third was collecting the finished shakes and putting them out in the grass to dry. In other places around the house, another painter was priming the shakes that already went up yesterday, and she started scraping paint off the old shakes. The idea is to start priming the old part of the house this week (I think?). We have decided on a similar color scheme, but the main body of the house will be one shade lighter.

The new shower in place!



Priming, Day One

Will there be enough cedar shakes...? Only time will tell I guess 

Just some old bricks salvaged from the chimney


The assembly like


Drying shakes


These leaves are coated so thickly in paint that they look fuzzy.....Cool, but real gross at the same time

They painted our grass by default..the darkest patches (minus the shadows) are where the grass looks fuzzy because the paint is coated so thick (see previous picture)

Our mini mountain of primed shakes

Tuesday, August 2, 2011

Electrical Wires

Not a whole lot happened here today. The shower was delivered first thing this morning and is currently sitting in our front yard, and the electrician was here more or less all day today, doing what he does best and wiring us some outlets. He also added a new outlet to the room of crap, and in the process, found some old wallpaper in the wall! It is paper on top of some sort of fabric base, and looks as though it was hand painted with the design. The silver design is even sparkly! Pretty awesome!

Our shower!


Ceiling wires in the kitchen

No more scary wires here! Yay!

Lots 'o wires...

Our new outlet
The old wallpaper and some crazy wires that the electrician took out of the wall in the room of crap (plus Dori's nose in the top left corner.."helping")




Pretty cool stuff!