Tuesday, July 19, 2011

Makeshift Kitchen

Thursday afternoon after I had left town, mom texted me saying that Jim, our contractor, wanted to strip the kitchen on Monday. Oh boy. So, Sunday night and Monday morning, our task was to create a makeshift kitchen in our dining room. Our sink complex was cut out of the wall and re-routed into the dining room, plumbing and all, and the fridge was also moved. As for the rest? Either boxed up, thrown out, or put onto shelves that have expanded into our living room. It's going to be a tight squeeze for a while.














The discovery of the day: If you look real close, the orangy-brown thing and the grey fuzz on the end of the mouse trap appear to be a mouse skull and remaining fur that was found under our sink complex and has been there for who knows how long....long enough to completely decay evidently. How gross is that?!

Slacking

Oh hey folks. I've been slacking in my picture posting...sorry. First up: the window extravaganza from Thursday/Friday last week.


This is how they got in and out of the plasticked-in deconstruction chimney room (see Chaos entry) 


And what it looks like after they sheetrocked the chimney opening

The remnants of our chimney

The new north window is in place! 

The roof will make this window a little smaller...

No windows! If you look close at the window on the right (click the picture to make it bigger), you can see the weird circle hole things they drilled out and stuffed with insulation

There was no insulation at all above the window...once again, a surprise to the workers and no surprise at all to us


Thursday, July 14, 2011

Windows, Saws, and Garages Galore

Yesterday saw a little bit of everything....The concrete/stone cutter was back and cut out a new basement window since the masons filled in the other one this week. He also used that same GIGANTIC saw that he used on to cut the doorway in the old basement wall to cut a chunk out of the old wall next to the doorway so they can use the space for ductwork into the new part. That way they don't have to run pipes and wires and whatnot through the doorway. Meanwhile, they finished removing the chimney through the second floor (the rest of it comes out next week) and patched up the hole with drywall, and started framing up garage walls! And all the windows were delivered as well and are now sitting inside the addition. With this project, we are replacing all the windows in our house with new, vinyl, double hung ones. No more storm windows! Hooray!

Saying that, I am headed to the cities today for the weekend, but when I left home at lunch, the guys were replacing all the old windows in our upstairs (not counting mine and the bathroom windows, which were replaced maybe four years ago). They took out all the old windows at the same time, leaving four gaping holes in our walls. Then they bored three holes maybe two or two and a half inches in diameter into each side of the remaining frame and shoved insulation into the space with what looked like a wooden ruler (it wasn't actually a ruler, but it was about the same shape and size as one). I left my camera at home with my momma, so pictures of today's adventure and whatever happens tomorrow will come on Sunday when I get back!

Hard to see, might be easier if you click the picture to make it bigger, but this is where they cut out a chunk of old foundation for ductwork to go through


Salvaging rocks. Naturally. 
New window location
Looks like they just pushed the new window out of the hole like the game Jenga! 
Chimney bricks that are probably original to the house (aka 100+ years old!)



Lots of creative temporary support beams to keep the garage together overnight! One nailing the north wall to the east wall, one nailing the north wall to the unfinished west wall that is still sitting on the floor, and one nailing the south wall to the house! 



Need any PVC corners? We got 'em...

Tuesday, July 12, 2011

Chaos

On my way home from work at noon today, mom sent me a text saying "be prepared for chaos." When I got home, she was frantically taking all the contents of Papa's closet out and relocating them to my bed, boxing up and moving items out of the Room of Crap, and covering everything with construction-grade plastic. Why? Because the workers decided that today would be a good day to start taking out the chimney. Originally they gave us Thursday as a potential date for that adventure....meaning we had penciled in another day and a half to clean up and box things. Oh boy. The chimney runs through the wall between the Room of Crap and my parent's room and then down through the wall between the kitchen and the dining room. After our part of the job was done, the workers made themselves a floor to ceiling room out of plastic on both sides of the wall with the chimney in it and got about three feet of it removed before they headed out for the day (not counting the outside part that was taken down earlier in the day.

In other areas of construction, the masons were back today and put in a row of concrete blocks around the garage slab, and filled in one of the new basement windows with cement blocks. We all realized that the location of the left basement window (when looking at the addition from our back yard) would be a water-trap....funneling all the water from the roof, garage, and driveway into our basement via the basement window.  So we (aka the masons) filled it in and will cut a new window into the cement wall somewhere else to replace the one we lost.

And last but not least, all the walls inside the addition were framed up today! Hooray!









The doorway from the new entryway/dining room area to the new bathroom
The other bathroom door
The hole in the floor is where our new toilet will be! 
Our new shower!
Our new bathroom:

Bottom left corner: the new shower
The hole in floor in the middle of the picture: the toilet
The doorway on the right side: the door
Where I'm standing and taking the picture from: the windows (can be seen in a previous post) and the vanity


Monday, July 11, 2011

Before and After

On Friday, the construction guys came bright and early as usual and over the course of the day, they put up the main ceiling beams. They look just like I-beams, but made out of wood instead of steel. Jim, our contractor, told us that these beams are super strong and heavy duty, because the new roof is flat and will be a "snow trap."

Today they put most of the roof on, and sawzawed the existing outside wall where they will cut out a new door at the bottom of our stairs to go into our new bathroom. And sawzawed the outside wall where the back porch was attached to the kitchen because that wall will be completely opened up to our soon-to-be remodeled kitchen space.

The "shocking" news of the day for the workers: there was no insulation at all in the wall between our old back porch and the kitchen. Something we have known forever by process of elimination......in the winter, that wall radiates cold air each and every day. Especially when it is -20.

Meanwhile, the plumber has been here last week and today, replacing our water heater with a new one that vents through the outside wall, replacing the main sewer pipe and the horizontal pipe that goes to our existing bathroom, and updating many other ancient black steel pipes throughout our basement. He has also been busy plumbing our new bathroom and the new location for our washer and dryer (which will no longer be in the basement!) 






Looks like truck central.....there's another one parked on the other side of the street behind the plumber's white van. 

Before

After: this will eventually be a bathroom door.

Before


After

Where did all these wires come from?!?!?!